Keppel Project 20 Expansion & Upgrade

Client Keppel Data Centres

Consultant CBRE

Start Date March 2018

Finish Date December 2019

Project Description

This project was driven by a need to upgrade the existing infrastructure to meet the needs of Keppel Data Centres for the next 15years+. Works are designed and planned to replace legacy an inefficient M&E systems and to offer enhanced availability. Works are conducted in a live data centre environment. The main elements of the works include MV Upgrade, LV Upgrade, Generator and Associated Fuel Transfer systems, Cooling Upgrade, UPS Upgrade, BMS Upgrade, Fire Alarm and Emergency Lighting Upgrade and Building Ancillary works associated with the above upgrades. 

Suir Engineering Scope of Work

Suir Engineering’s electrical scope of work for this project includes items outlined below:
  • Phased changeover of Cooling Systems
  • Removal of obsolete services
  • Pipework, Insulation & Fittings
  • Fuel Transfer System
  • Leak Detection System & Drip Trays
  • Circulating Pumps
  • Water Services
  • Hot Water Generator
  • Ventilation Ductwork & Fittings
  • Heat Recovery Units 
  • Air Handling Units
  • Extract Fans
  • Soils & Wastes
  • Sanitary Fixtures 
  • WDX Cooling Systems
  • Variable Refrigerant Flow Air Conditioning System
  • One to One Split Type Air Conditioning Units
  • Refrigerant Pipework
  • Cable Installations
  • Segregation in MV, LV and UPS Switchrooms
  • MV Switchgear & Transformer
  • LV Switchgear
  • LV Main & Sub-Main Cables
  • Busbar Trunking Systems
  • UPS Systems
  • General Lighting & Small Power 
  • Emergency Lighting
  • General Services
  • Wiring of BMS & EPMS
  • Mechanical Systems Wiring
  • Fire Detection & Alarm 
  • Earthing & Bonding
  • Testing & Commissionin