Cordal 110KV Substation Project

Client Cubico Energy

Consultant Ionic Consulting

Start Date June 2016

Finish Date November 2017

Project Description:This contestable 110kV Project is located in Co.Kerry and consists of a 3Bay 110kV AIS and 5Bay 38kV AIS substation. The substation was part of a large Wind Park development being constructed by Cubico Energy. The station is tail feed by 10KM of 110kV underground cable from the existing Eirgird Substation​.

Suir Engineering were responsible for the full turnkey project and took the role of Project Supervisor Construction Stage (CDM) along with responsibility for the following:

Civil design and Construction of 110kV Substation.​
Electrical Design, Procure and Installation of 110kV AIS Equipment.​
Procure, Install and Commission 1no 63MVa 110/38kV Siemens Power Transformer.​
Procure, Install and Commission 1no 120MVa 110/33kV Siemens Power Transformer.​
Design, Procure, Install and Commission Protection & Control Panels​
Design, Procure, Install and Commission DC Battery Systems​
Design, Installation and Test of Earthing System.