Client Cubico Energy

Consultant Ionic Consulting

Start Date June 2016

Finish Date November 2017

Project Description

This contestable 110kV Project is located in Co.Kerry and consists of a 3Bay 110kV AIS and 5Bay 38kV AIS substation. The substation was part of a large Wind Park development being constructed by Cubico Energy. The station is tail feed by 10KM of 110kV underground cable from the existing Eirgird Substation. Suir Engineering were responsible for the full turnkey project and took the role of Project Supervisor Construction Stage (CDM) along with responsibility for the following:

Suir Engineering Scope of Work 

Suir Engineering’s electrical scope of work for this project includes items outlined below.
 
  •  Civil design and Construction of 110kV Substation
  • Electrical Design, Procure and Installation of 110kV AIS Equipment
  • Procure, Install and Commission 1no 63MVA 110/38kV Siemens Power Transformer
  • Procure, Install and Commission 1no 120MVA 110/33kV Siemens Power Transformer
  • Design, Procure, Install and Commission Protection & Control Panels
  • Design, Procure, Install and Commission DC Battery Systems
  • Design, Installation and Test of Earthing Systems
  • Management of Full Turnkey Project
  • Project Supervisor Construction Stage Role (CDM)