Glanbia Project Topaz

Project Description

Project Topaz consisted of a new 7.5t/hour drying process expansion of the Glanbia Ireland Belview facility, in order to increase capacity, a new third drier was added at the Belview plant.

The overall expansion project encompassed new:

  • Milk intakes
  • Pasteurisers
  • Evaporation facilities
  • Drying facilities
  • Bagging facilities

Suir Engineering Scope of Work

Suir Engineering’s electrical scope of work for this project includes items outlined below:
  • Medium Voltage Installation.
  • Low Voltage Installation.
  • Installation of MCC’s & Low Voltage Switchgear. 
  • Sub-Mains Cabling.
  • Ladders / Trays / Panelboards.
  • Low Voltage General Services.
  • Process Power.
  • HVAC Power.
  • Earthing & Lighting Protection.
  • Lighting & Emergency Lighting. 
  • Fire Alarm.
  • Security. 
  • External Lighting. 
  • Public Address. 
  • Voice & Data.
  • I&C Containment & Support Process. 
  • generator Installation.
  • UPS Installation.
  • Power Factor Correction.

Almarai Project Palm – Poultry Processing Plant, Ha’il

Inside view of a very large Poultry Processing Plant

Project Description

In 2009, Almarai, the world’s largest integrated food supplier, added poultry products to their portfolio through the acquisition of Hail Agricultural Development Company (HADCO). After investing in a world-class production facility, they launched the new premium poultry brand – Alyoum.

This project involved the building of a new poultry processing plant for Almarai in Ha’il. The output capacity of the facility is 2 x 12,000 birds per hour and consists of 16 weighing and packing lines. The entire installation is to food grade standard.

  • Project: Project Palm
  • Client: Almarai
  • Value: €11.5 Million
  • Consultant: Almarai
  • Builder: AMANA

Suir Engineering Scope of Work

Suir Engineering’s electrical scope of work for this project includes items outlined below:
  • Design of Electrical Services
  • Sub-Mains Cabling Installation
  • Lighting and General Services Installation
  • Power Distribution
  • External Lighting
  • Hook-up of Process Equipment 
  • Testing & Commissioning
 

Almarai Project Cradle – Riyadh, Kingdom Of Saudi Arabia

External view of whole building at Almarai Project Cradle – Riyadh, Kingdom Of Saudi Arabia

Project Description

Almarai is the world’s largest vertically integrated dairy operator. Synonymous with dairy products of the highest quality, diversifying into fruit juice, bakery and poultry products has also made Almarai a food company.

Project Cradle involved the building of a new state-of-the-art baby food manufacturing plant in Al-Kharj in Saudi Arabia.

  • Project: Project Palm
  • Client: Almarai
  • Value: €7 Million
  • Consultant: Almarai
  • Builder: AMANA

Suir Engineering Scope of Work

Suir Engineering’s electrical scope of work for this project includes items outlined below:
  • Design of Electrical Services
  • Sub-Mains Cabling Installation
  • Lighting and General Services Installation
  • Power Distribution
  • External Lighting
  • Hook-up of Process Equipment 
  • Testing & Commissioning
 

United Fish Industries Killybegs Reconfiguration Project

plant processing set up at Kerrygold Butter Packaging Facility Mitchelstown, Cork

Project Description

An investment by United Fish Industries (UFI) and the Pelagia Group of €30 million has seen one of the iconic fish processing plants in Killybegs, Donegal being totally redeveloped and reconstructed into one of the most modern Marine Ingredient plants in the world.

The transformation of the plant was a unique complex design and build project as it essentially involved constructing a new factory on the existing site while maintaining production throughout the project.

The rebuilt and redesigned plant now houses state of the art steam generation, production processes, waste heat evaporative capacity, computer control systems and environmental control systems that enable it to process 1200 tonnes of fish per day. Suir Engineering provided the project with complete mechanical installation services.

Suir Engineering Scope of Work

Supply & Installation of all pipework and supports including; 
  • Process pipework.
  • Purified water pipework.
  • CIP pipework.
  • Process air pipework.
  • Nitrogen pipework.
  • Heat transfer fluid pipework.
  • Drainage assemblies.
  • All associated inline valves and instruments.

Kerrygold Butter Packaging Facility Mitchelstown, Cork

External View of Kerrygold Butter Packaging Facility Mitchelstown, Cork

Project Description

The project comprised of the construction of a new Kerrygold Butter Packaging Facility in Castlefarm, Mitchelstown, Co. Cork. The new facility incorporates administration offices, changing areas, production and packaging / palleting areas, dry goods storage, goods in an out and a +4°C Cold Store.

Suir Engineering Scope of Work

Suir Engineering’s electrical scope of work for this project includes items outlined below:
  • Site / Utility Services
  • Heating Installations (MTHW & LPHW)
  • Main Water Installations
  • Domestic Water Services Installations
  • Process Water Systems
  • Heat Recovery Ventilation Installations
  • Mechanical Ventilation Installations
  • Air Conditioning Installations
  • Process Chiller and Cooling Water Installation
  • Cold Store and associated DX cooling
  • Soils and Wastes Installations
  • Fire Fighting Installation 
  • Compressed Air Installation
  • Specific Ventilation Systems

Glanbia New Dairy Processing Facility

Glanbia New Dairy Processing Facility under construction

Project Description

This project involved the construction of a new Dairy Processing and Manufacturing Facility for the manufacturing and development of dairy projects in Kilkenny Ireland. The facility is one of the most modern and largest facility of its kind in Europe. The total 

The total building area of 24,597 sq. meters comprising of 2 story administration and laboratory building, a five-story production building with 4 flues, a raw material storage warehouse, a dairy ingredients intake building, a utility building, a 38kv substation, a tank farm, a waste water pre-treatment building with waste water neutralisation tanks.

Suir Engineering Scope of Work

Suir Engineering’s electrical scope of work for this project includes items outlined below:
  • Medium Voltage Installation.
  • Low Voltage Installation.
  • Installation of MCC’s & Low Voltage Switchgear.
  • Sub-Mains Cabling.
  • Ladders / Trays / Panelboards.
  • Process Power.
  • HVAC Power.
  • Earthing & Lightning Protection.
  • Lighting * Emergency Lighting.
  • Fire Alarm.
  • Security.
  • External Lighting. 
  • Public Address. 
  • Voice & Data.
  • I&C Containment & Support Process.
  • Generator Installation.
  • UPS Installation.
  • Power Factor Correction.