Project Description
The project comprised of the construction of a new Kerrygold Butter Packaging Facility in Castlefarm, Mitchelstown, Co. Cork. The new facility incorporates administration offices, changing areas, production and packaging / palleting areas, dry goods storage, goods in an out and a +4°C Cold Store.
Suir Engineering Scope of Work
Suir Engineering’s electrical scope of work for this project includes items outlined below:
- Site / Utility Services
- Heating Installations (MTHW & LPHW)
- Main Water Installations
- Domestic Water Services Installations
- Process Water Systems
- Heat Recovery Ventilation Installations
- Mechanical Ventilation Installations
- Air Conditioning Installations
- Process Chiller and Cooling Water Installation
- Cold Store and associated DX cooling
- Soils and Wastes Installations
- Fire Fighting Installation
- Compressed Air Installation
- Specific Ventilation Systems