Barnageeragh 110kV GIS Substation & Grid Cable

Project Description

The Barnageeragh 110kV Station and Grid Route is a turnkey installation where Suir Engineering were appointed as the general contractor for the project. The remit from project inception was to assist our client in the following: 

  •  Pre-planning stage including management of 3rd party regulatory bodies such as Eirgrid, ESB, Planning authorities and utility providers. 
  • Early engagement on design and key deliverables allowing a collaborative approach to the Barnageeragh project. 
  • Value engineering at concept / basic engineering stage while adhering to asset management specifications.
  • Identification of grid routes through challenging areas (both industrial and public) with a high density of existing infrastructure.
  • Delivery within a timeframe to meet Data Centre customer requirements.

Suir Engineering Scope of Work 

Appointed as the General Contractor, Suir Engineering were responsible for all design, build and commissioning deliverables to the regulatory specifications. A turnkey multi-discipline installation including full civil, mechanical and electrical requirements has being delivered within the original timeframe and ahead of overall schedule. 


The scope of works includes:
  •  Site establishment and logistics including traffic management (including public highways).
  • Project Supervisor Construction Stage Role. (CDM)
  • Civil installation including groundworks, substructure and dual 110kV grid. installation within an urban / industrial environment.
  • CSA installation of multi-level steel superstructure, cladding and concrete 1st floor.
  • Electrical – LV / HV infrastructure and cabling.
  •  Equipment – supply and installation of GIS Switchgear and ancillary LCC panels. 
  • Supply and installation of 12.5km of 110kV cabling.
  • Control and Protection Installation. 
  • Mechanical installation for the station. 
  • Full commissioning and handover of the installation.

MSD – CARLOW 2

Project Description

This project involved the investment by MSD in their Carlow site to secure the production of the biologic and vaccine pipeline for two of it’s major products in Keytrunda and Gardasil 9. The aim of this project is to support the MSD productions capacity for Keytrunda and Gardasil 9 by building a state of the art facility that mimics the current Carlow 1 in size, layout and capacity to leverage the current knowledge from the current site operation. 

The Carlow 2 project consisted of several buildings:

  •  Production Building
  • Spine Corridor Expansion 
  • Dedicated Clean Utility Building 
  • Black Utility Expansion 
  • Warehouse Expansion  

The scope also included changes to the existing Carlow 1 

  •  Reduction of existing warehouse ambient storage area to provide new QC and MRO area 
  • Extension of existing Grade C Kitting area 
  • Tie in an extension of existing electrical rooms (LV & MV)
  • Installation of chiller and cooling tower in existing CUB

Suir Engineering Scope of Work 

Suir Engineering’s electrical & instrumentation scope of work for this project includes items outlined below:
 
  •  Electrical Equipment Installation
  • MV Switchgear (Free Issue)
  • LV Unit Substations (Free Issue)
  • Generator, Step Up, Transformer & NEW (Free Issue)
  • Step Up Transformer for Existing Generator (Free Issue)
  • Main Distribution Panels
  • UPS Panels , Distribution Boards & Equipment 
  • Variable Speed Drives (VSD) and Direct On Line (DOL) Enclosures 
  • Final Distribution Boards 
  • Active Harmonic Filtering Systems 
  • Photovoltaic Systems 
  • MV, LV Power and Control Cabling Infrastructure 
  • Cable Containment Systems 
  • General Services and Small Power Systems 
  •  Process and HVAC / Mechanical Services Power Supplies
  • Normal & Emergency Lighting Systems 
  • iLighting Controls System
  • Fire Alarm System 
  • Gas Detection System 
  • Security Access Control & CCTV Systems 
  • BMS DUP’s
  • BMS Cabling 
  • Earthing and Equipotential Bonding Systems 
  • Lighting Protection Systems 
  • Energy Monitoring Systems 
  • Testing & Commissioning of all Systems 
  • Handover Documentation and Systems Demonstrations

Kellystown 220kV Substation & Grid Cable Project

Project Description

Suir Engineering was responsible for turnkey delivery of a 220kV GIS Network Substation on a site in Kellystown, Co Kildare.

 This project includes the design, construction, testing and commissioning of all civil and structural works, primary / secondary equipment and auxiliary services required for a functioning GIS substation. 

The key features of the project are a 220kV GIS building, 220kV double busbar GIS, 3150 A rating consisting of 18 no. bays & substation control system and protection systems. Suir Engineering has also been responsible for installing two 220kV cable circuits from line / cable interfaces to the 220kV GIS Substation and to install three (3) 220kV cable circuits from 220kV GIS Substation to third party transformers.

Suir Engineering Scope of Work 

Suir Engineering’s electrical scope of work for this project includes items outlined below.
 
  •  Civil design and Construction of 220kV Substation
  • Civil Design and Construction of 6KM of 220kV Grid Cable 
  • Civil design, Planning Process and Construction of 6No Directional Drills 
  • Liaise with Kildare Co.Co, ABP, Irish Water, Irish Fisheries etc
  • Electrical Design, Procure, Install, Joint and Test 220kV Cable
  • Electrical Design, Procure and Installation of Control & Protection Systems
  •  Design, Procure and Installation of AC & DC Systems 
  • Design, Installation and Test of Earthing System
  • Design, Procure and Installation of Building Services Systems 
  • Installation and Assembly of 220kV GIS Switchgear
  • Substation Commission and DOF

WuXi Biologics

Project Description

 WuXi Biologics invested €325 Million on a new Biologics facility in Dundalk, Co. Louth. This 54,232sqm biopharmaceutical manufacturing facility on a 20.74-hectare greenfield site is set to become the world’s largest single-use biologics manufacturing facility. The state-of-the-art manufacturing facility will feature single-use bioreactors for commercial biomanufacturing, as well as next-generation processing technology.  It will be the first WuXi Biologics manufacturing facility outside of China and is expected to help accelerate biologics development in Europe. The site in Dundalk, Co Louth aims to provide 400+ jobs in the community.

Suir Engineering Scope of Work

Suir Engineering’s were responsible for the temporary electrical package, design assist and the Electrical & Instrumentation Package.
The Scope of Work comprises design assist, supply, installation and testing and selected commissioning of the following.
  • PAS system including equipment, containment and associated wiring, RV of free issue instrumentation, sub-assembly of equipment skids.
  • Misc. Systems – Disabled Toilet System, Disabled Refuge System, Heat Tracing.
  • Life Safety Systems (natural gas, Co2, LEL, oxygen depletion)
  • Equipment Installation, Free Issues and Contractor Procured. 
  • Contractor / Vendor Co-ordination. 
  • LV Distribution – Normal, Emergency, UPS. 
  • Lighting Systems – Normal, Emergency. 
  •  Fire Alarm Systems.
  • Voice, Data Security. 
  • Public Address.  
  • Access Control. 
  • Earthing Systems – Normal, Clean.  
  • Containment. 
  • BAS System. 

Hanover Quay Commercial Development

Dublin-Docklands-Development

Project Description

This project involved the Electrical Services Shell & Core Installations for an Office & Commercial development of Block C1  Hanover Quay, Dublin 2.

The development consisted of 7 floors of office space over one level of basement car parking. There were also extensive site services works to the surrounding street level for incoming utilities and new public lighting scheme.

Suir Engineering were responsible for the following works carried out as part of the Shell & Core contract. 

Suir Engineering Scope of Work

Suir Engineering’s electrical scope of work for this project includes items outlined below:
  • New MV distribution switchgear
  • New cast resin transformers
  • New main LV switchgear
  • New life safety generator Installation
  • New electrical containment systems
  • New installation of general services
  • New computer based central internal and external addressable KNX Lighting Control system
  • New computer based central maintenance and monitoring system in order to carry out testing of the single point self-contained addressable Emergency Lighting system
  • New addressable fire alarm system
  • New disabled toilet alarm system
  • New Category 6A structured cabling installation
  • New lightning protection, earthing and bonding
  • New Security System

Keppel Project 20 Expansion & Upgrade

Project Description

This project was driven by a need to upgrade the existing infrastructure to meet the needs of Keppel Data Centres for the next 15years+. Works are designed and planned to replace legacy an inefficient M&E systems and to offer enhanced availability. Works are conducted in a live data centre environment. The main elements of the works include MV Upgrade, LV Upgrade, Generator and Associated Fuel Transfer systems, Cooling Upgrade, UPS Upgrade, BMS Upgrade, Fire Alarm and Emergency Lighting Upgrade and Building Ancillary works associated with the above upgrades. 

Suir Engineering Scope of Work

Suir Engineering’s electrical scope of work for this project includes items outlined below:
  • Phased changeover of Cooling Systems
  • Removal of obsolete services
  • Pipework, Insulation & Fittings
  • Fuel Transfer System
  • Leak Detection System & Drip Trays
  • Circulating Pumps
  • Water Services
  • Hot Water Generator
  • Ventilation Ductwork & Fittings
  • Heat Recovery Units 
  • Air Handling Units
  • Extract Fans
  • Soils & Wastes
  • Sanitary Fixtures 
  • WDX Cooling Systems
  • Variable Refrigerant Flow Air Conditioning System
  • One to One Split Type Air Conditioning Units
  • Refrigerant Pipework
  • Cable Installations
  • Segregation in MV, LV and UPS Switchrooms
  • MV Switchgear & Transformer
  • LV Switchgear
  • LV Main & Sub-Main Cables
  • Busbar Trunking Systems
  • UPS Systems
  • General Lighting & Small Power 
  • Emergency Lighting
  • General Services
  • Wiring of BMS & EPMS
  • Mechanical Systems Wiring
  • Fire Detection & Alarm 
  • Earthing & Bonding
  • Testing & Commissionin

Project ARN51 Confidential Client, Sweden

View inside a data centre

Project Description

Suir Engineering was appointed as a main contractor for ARN51 ROMP01 (phase 2) Project Supply & Installation of general contractor services, mechanical services, electrical services, sprinkler services, security services for a confidential data centre client in Katrineholm, Sweden 

The overall Campus project consists of a secured entry, site roads, a substation, a process water storage area, MV Substation, generators and Data Centre Building. Project ARN51 in Katrineholm  consists of a Data Centre Building approximately 14,000M2 and will utilise 34MW of power at full capacity.

   Suir Engineering Scope of Work

     As general contractor Suir Engineering has responsibility for the following:
  • Supply & installation of general contractor services (including but not limited to external civils works, external enclosures, fencing, structural, steel, cladding, wall erection, fireproofing, plastering, painting, ironmongery)
  • Mechanical services (including but not limited to AHU, ventilation, air conditioning, water services, humidified water, general drainage).
  • Electrical services (including but not limited to BMS services, commissioning, fire alarm, security services, hot aisle containment install, rack install, busbar install, general power & lighting, external lighting services, MV cable works, substation works).
  • Sprinkler Services 
  • Security Services 
  • Testing, Commissioning and Handover

Cordal 110kV Substation Project

Suir Engineering tightening a bolt at an energy plant

Project Description

This contestable 110kV Project is located in Co.Kerry and consists of a 3Bay 110kV AIS and 5Bay 38kV AIS substation. The substation was part of a large Wind Park development being constructed by Cubico Energy. The station is tail feed by 10KM of 110kV underground cable from the existing Eirgird Substation. Suir Engineering were responsible for the full turnkey project and took the role of Project Supervisor Construction Stage (CDM) along with responsibility for the following:

Suir Engineering Scope of Work 

Suir Engineering’s electrical scope of work for this project includes items outlined below.
 
  •  Civil design and Construction of 110kV Substation
  • Electrical Design, Procure and Installation of 110kV AIS Equipment
  • Procure, Install and Commission 1no 63MVA 110/38kV Siemens Power Transformer
  • Procure, Install and Commission 1no 120MVA 110/33kV Siemens Power Transformer
  • Design, Procure, Install and Commission Protection & Control Panels
  • Design, Procure, Install and Commission DC Battery Systems
  • Design, Installation and Test of Earthing Systems
  • Management of Full Turnkey Project
  • Project Supervisor Construction Stage Role (CDM)

Slievecallan 110kV Substation & Cable Project

slievecallan wind farm under construction

Project Description

This contestable 110kV Project is located in Co.Clare and consists of a 3Bay 110kV AIS substation located in Slievecallan.  The substation was part of a large Wind Park development being constructed by WCRE. The station is tail feed by 31KM of 110kV underground cable from the existing Ennis ESBN Substation.

Suir Engineering were responsible for the management of full Turnkey Project & PSCS role for the Substation and Cable route.

Suir Engineering Scope of Work

Suir Engineering’s electrical scope of work for this project includes items outlined below:
  •  Civil Design and Construction of 31KM Cable Route
  • Liase with Clare Co.Co, NRA, Irish Water, Irish Fisheries etc
  • Electrical Design, Procure, Install, Joint and Test 31Km 110kV Cable
  • Civil Design and Construction of 110kV Substation 
  • Electrical Design, Procure and Installation of 110kV AIS Equipment
  • Procure, Install and Commission 2no 116MVA 110/33kV Transformers
  • Design, Installation and Test of Earthing Systems
  • PSCS Role for Substation and 31KM Cable Route (CDM)